LUMII 24 Hour Heavy Duty Timer with UK Plug
- It has 96 switching operations within a 24 hour period (every 15 minutes)
- Designed to take high loads: it has no problem dealing with the inductive loads produced by a 600w ballast or up to 6x 200w CFLs!
- Saves you money: no separate contactor needs to be purchased!